top of page

Educational

Other: Text

Grosse Pointe Public Schools

While a large portion of my experience is in education, many of these projects included maintenance work scope and historical restoration covered under school bonds. During my time at Ehresman I was able to assist on the scope drawing development for several schools covered under a $111 million bond.

​

Several of the above referenced completed projects include:

  • Trombly Elementary Greenhouse Stabilization

  • North High School Stage Floor Replacement

  • Richard Elementary Gym Floor Replacement

  • South High School Stair Water Infiltration

  • South High School Rain Conductor Improvements at Main Building

  • North and South High School and Monteith Elementary Tuckpointing

  • Poupard Elementary Library Ceiling Replacement

  • South High School Cleminson Hall Window Restoration


Bond Work Scope Designs for 2020 and 2021 construction include:

  • Secure Entry

  • Abatement

  • Flooring and Ceiling Replacement

  • Locker Replacement

  • Lighting Improvements

  • Mechanical System improvements

  • Room Reconfigurations

​

As a continuation of my role in Grosse Pointe Schools, with my new role at North American Construction I may also be involved in managing the construction for some of the above named Grosse Pointe School bond projects.

Other: Text

Waterford Montessori

Building Addition (CDs Complete - Project on Hold)

Other: Text

Other Projects

HEALTHCARE

Advantage Health Thea Bowman - Detroit, MI (Under Construction)

​

INDUSTRIAL

Reforma Group C of O Improvements - Southfield, MI (Plan Review)

​

Other: Text

248.722.2250

  • linkedin

©2020 by Jagoda Shipley. Proudly created with Wix.com

bottom of page